POLY CLEAR
A solid color system with our tried and true 100% solids epoxy, Epoxy Flow 100, as a base coat and UV stable Poly 90/85 as a topcoat. Creates a thicker, smooth floor.Available in slow set options for extended work times during installation.
EPOXY POLY SOLID COLOR SYSTEM BENEFITS AND CHARACTERISTICS
EPOXY POLY SOLID COLOR SYSTEM BENEFITS AND CHARACTERISTICS

Scratch & Scuff Resistant

LOW ODER

LONG WORK TIME

CHEMICAL RESISTANT

INTERIOR

HOT TIRE RESISTANT
CROSS SECTION LAYER

- Basecoat = Poly 90 @ 200 sqft/gallon
- Flake @ 10 sqft/pound (full flake)
- Topcoat = Poly 90 @ 175 sqft/ gallon
Step-by-Step Installation of Epoxy Solid Color Instructions
Pre-Application Assessment & Preparation
PREP
- One of the key components is to ensure that the surface is free from sealers, dirt, oils, glues and other contaminants.
A few methods for properly preparing the concrete are:
- Using a lower grit (16, 30) metal bond diamond tool on a single headed or planetary grinder with a vacuum and grinding dry. In order to accomplish this floor in ‘One Day”, dry grinding would be necessary.
- This is the primary method for prep used by Professionals.
- Note: Water should not be used for prep. Insure floor and joints are ‘bone dry’ before coating
- Any repairs need to be done prior to prep.
APPLICATION OF POLY 90
Mix the Poly by drill mixing. (1:1) ratio
Poly should be applied by pouring the product on the floor and using a flat or small notch (5-7 mil) squeegee and immediately back rolling with a ⅜” nap, 18” roller. Dip and roll methods can also be used when the floor is saw cut into small sections that make squeegeeing prohibitive. Approximate coverage with this method is 250 sqft per gallon
- Poly 90/85 Slow hangs out in the bucket better than on the floor. Only apply the amount of product that can be effectively squeegeed and backrolled adequately at a time.
- Add traction additive if desired when mixing.
Apply Poly 90 (or Poly85 Slow) Top Coat:
After the first coat has sufficiently set and is no longer tack free the second coat Poly 90/85 Slow can be applied. If beyond the recoat window or microbubbling occurred screen and dry wipe prior to recoating. Note: Never apply until the 1st coat is tack free. Mix the Poly by drill mixing. (1:1) ratio
Poly topcoat is best applied by pouring the product on the floor and using a flat or small notch (5-7 mil) squeegee and immediately back rolling with a ⅜” nap, 18” roller. Top coats tend to lay out better with less chance of roller lines when using a squeegee and back rolling. Approximate coverage with this method is 250 sqft per gallon
- Poly 90/85 Slow hangs out in the bucket better than on the floor. Only apply the amount of product that can be effectively squeegeed and backrolled adequately at a time.
- Add traction additive if desired when mixing.
- Protect area from traffic until the coating has sufficiently dried (refer to data sheet for dry times)
VIDEOS
Videos of Solid Color Epoxy System:
Coverage rates are averages and can vary by applicator and does not account for waste. Please order extra.